@include('LifeAtGainup.production.header')
GUT Production Dashboard
>
Cutting Output
Cutting Output
Pieces
Lay
Kgs
0
0%
vs yesterday
Target: 0
Fabric Utilization
86%
2%
vs last week
Target: 90%
First Time Right
97%
0.5%
vs last week
Target: 95%
Marker Efficiency
88%
3%
vs last week
Target: 90%
Machine Downtime
124 mins
5%
vs yesterday
Target: 90 mins
Overall Trend
Time-series trend for the selected KPI
Machine-wise Total Pieces
All Units
All Units
Unit 1
Unit 2
Attribute Drilldown
Daily KPI
Cumulative Progress
ALL CC
Cutting Details
A detailed log of each cutting lay operation.
Date
Lay ID
Unit / Shift / Machine
CC
OCN / Style / Color
Rolls Used
GSM
Fabric Wt. (kg)
End Bit
Cutting Time (min)
Cutting Output
Ack. pend
SM Received
Line Qty
Roll Details
Roll No.
R_Points
Supplier
Shade
Relax (hrs)
Cut Output Breakdown
Size
Qty
FPY%
Ack. Pending Breakdown
Size
Qty
Issued to SM Breakdown
Size
Qty
Line Issue Breakdown
Size
Qty
Showing 1 to 10 of 50 entries
Previous
Page 1 of 5
Next