Internal BR %
Internal BR %
Blocking Rate: percentage of failed inspections relative to total completed audits.
Formula: (Failed POs / Completed Inspections) * 100
of {{ $metrics['4w']['total_first'] ?? ($metrics['4w']['total'] ?? 0) }}
+1.5%
vs last month
Recheck Pending
Recheck Pending
Unique POs awaiting follow-up after a previous failure.
Formula: Count of POs with 'Recheck' status.
of {{ $metrics['4w']['total'] ?? 0 }}
vs last month
Recheck Rate
Recheck Rate
Volume of follow-up audits relative to total completed inspections.
Formula: (Recheck Count / Completed Inspections) * 100
of {{ $metrics['4w']['total_inspections'] ?? 0 }}
+0.5%
vs last month
FTP Rate
FTP Rate
Percentage of lots passing on the first audit attempt.
Formula: (First-Time Pass POs / Total First Audits) * 100
of {{ $metrics['4w']['total_first'] ?? ($metrics['4w']['total'] ?? 0) }}
+3.0%
vs last month
N-2 Reliability
N-2 Reliability
Inspections finished ≥2 days before the Estimated Handover Date (EHD).
Formula: (On-time Inspections / Total Inspected POs) * 100
of {{ $metrics['4w']['total'] ?? 0 }}
+1.5%
vs last month
Internal BR % Trend
Blocking Rate trend over time.
Internal BR % Analysis
Failure Reasons
Performance Contributors
CC
Model
Interactive Analysis Mode • Select items to filter dashboard
Inspection Images by PO
Grouped by Purchase Order • Click image to view details
Failed POs
3 purchase orders
| PO No | CC | Model | Qty | EHD | Packing | Homologation | Visual Ins | Measurement | Status | Ship |
|---|